Acceptable Reuse
Options (10/15/2001)
This document covers the reuse of existing Cisco network equipment.
Acceptance Criteria
(11/30/2001)
This document covers the CSU acceptance and testing criteria for the
new LAN electronics.
Baseline
Network Standards (10/15/2001)
This is the primary design reference document and the basis for most
of the other documents.
ITRP
Executive Org Chart & Key Contacts (11/12/2001) (powerpoint)
This document has the ITRP executive organization chart and key contact
information. This document also has a sample project timeline.
ITRP Implementation
Process (01/16/2002) (visio)
This is a flow chart diagram that shows the complete implementation
process.
ITRP Stage
1 & Stage 2 Integration (01/08/2002)
This document covers the integration issues and interdependencies between
Stage 1 (Capital Outlay) and Stage 2 (ITRP).
ITRP Stage 2
Design Guide (01/17/2002)
This document covers the design process and how to use the toolkit in
completing the campus design effort.
SBC
Sample Standard Baseline BOM (01/21/2002) (excel)
This is a sample Bill of Materials (BOM) used by SBC to submit the baseline
compliant campus design to the Chancellor's Office for approval.
SBC
Sample Standard Non-Baseline BOM (01/21/2002) (excel)
This is a sample BOM used by SBC to submit non-baseline compliant items
to the campus for approval.
SBC
Site Survey Appendix A Template v2.0 (03/05/2002) (excel)
This is the site survey document to be completed by each campus prior
to starting the design effort.